SHERWOOD INDUSTRIES IS AN ENVIRONMENTALLY RESPONSIBLE COMPANY. THIS MANUAL IS PRINTED ON RECYCLED PAPER.B Y : S H E R W O O D I N D U S T R I E S
speciFications:Table 1: 1200-V & 1700-V General Information.Model 1200 Insert 1700 InsertWidth x Depth27¾” x 21½” (705 mm x 546 mm)27¾” x 26” (7
11Specificationsclearances to comBustiBles - 1200-V insert:A Minimum clearance to an unshielded side wall 10” (254 mm)B Minimum clearance to an un
12Specificationsclearances to comBustiBles - 1700-V insert:A Minimum clearance to an unshielded side wall 10” (254 mm)B Minimum clearance to an unshie
13Specificationsdimensions - 1200-V insert:3413/16" (885mm)191/16"(484mm)or199/16"(497mm)225/16" (566mm)2615/16"(684mm)207/8&
Specificationsdimensions - 1700-V insert:3413/16" (885mm)191/16"(484mm)or199/16"(497mm)225/16" (566mm)2615/16"(684mm)207/8&qu
InstallationPlease read and understand these instructions before installing pedestal or ash pan and leg option. Failure to follow these
InstallationmasonrY Fireplace installation:Unless you are experienced, we recommend installation by your dealer or a professional installer.Install on
17The ue collar is removable for installations into replaces with low openings. a) Remove the rear two (2) secondary air tube and C-C
InstallationLeveling LegsFigure 14: Removable ue collar in place.Figure 15: Leveling legs.surround panel sealed installation For usa onlY:Note: Thoug
19Installationinstallation using a Block-oFF plate For usa onlY:If this unit is to be installed into a masonry replace or a zero-clearance replace w
Table of Contents2Safety Precautions...3Operating Instructions
Installation5. Mount the block-off plate using masonry screws in a masonry replace and sheet metal screws on a zero-clearance replac
21Installationmodel 1200-V Brick placement & tuBe locations:COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS.When replac
22Installationmodel 1700-V Brick placement & tuBe locations:COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS.When replac
23c-cast ceramic BaFFle installation:1. Slide the right C-Cast Ceramic Bafe in over the secondary air tubes at the top of the rebox. The tab must be
24FanWhiteBlackBlackBlackFan temperature sensorBlackFan controllerPower SupplyBlackBlackRocker SwitchManualAutoOffBlackInstallationFigure 24: Fireplac
InstallationremoVal oF Face:1. Remove the cast top from the unit (lift up and forward)2. Lift up and forward on the unit face, the entire face
Rating Label26**Alcove (Use double wall pipe) / Alcôve (Utilisant le double connecteur de mur) I Total width / Largeur totale 55” (1397 mm)Model/Modèl
Parts ListReference # Description Part #1 120F (49C) Ceramic Fan Temperature Sensor EC-0012 Insert Burner Switch EC-0263 FPI Fan Controller 115V EC-03
28Parts Diagram101113124255321177182321292622632331631342830278192099ITEM NO.Part # DESCRIPTION2. 1200-V Options & Parts/QTY.1 10-000Glass with Ta
29WarrantySherwood Industries Ltd. is the manufacturer of the Enviro line of heating products. At Sherwood Industries, our commitment to
3Safety PrecautionsFOR SAFE INSTALLATION AND OPERATION OF YOUR “ENVIRO” WOOD STOVE, PLEASE CAREFULLY READ THE FOLLOWING INFORMATION:● Please read this
Warranty6. If the problem is not covered by the Limited Warranty, the customer will be responsible for all repair costs, as well as all storage, ship
31Warrantynegligence, misuse, improper installation, alteration or adjustment of the manufacturer’s settings of components, lack of proper
32Installation Data SheetThe following information must be recorded by the installer for warranty purposes and future reference.NAME OF OWNER:________
Operating InstructionsFIRST STARTWhen rst installed, the chimney, rebricks and steel are cold and it usually takes several hours on a fairly high bu
CREOSOTE - ITS FORMATION AND REMOVAL:When wood is burned slowly, it may produce tar and other vapors that, combined with moisture, form creosote. The
6Operating Instructionsd) Regulate the heat output of the stove by adjusting the air controls to allow a larger re and vice versa. A short period of
7Operating Instructionsg) Once the kindling has started to burn, add some smaller pieces of seasoned, dry rewood. Note: Adding large piece
8Operating Instructions7. What is draft?Draft is the ability of the chimney to exhaust or draw smoke produced during the normal combustion process. T
9Operating InstructionsHow it works:Exhaust Smoke 1/2" Ceramic baffle;reflects heat downto burn the particlesin the smoke.Secondary air tubes;cre
Comments to this Manuals